Project details

Project Type

Education

Client

Boone County Board of Education

Contract Period

2022-2023

Construction Manager

Graybach LLC

Architect

Robert Ehmet Hayes & Associates

Engineer

Shrout-Tate-Wilson Engineers

Contract Value

Scope

Plumbing Construction

project DESCRIPTION

Renovation to all three (3) floors of the existing high school building. Existing restrooms will be completely re-piped with new water, waste and vent, along with new fixtures. The science rooms will be updated with new sinks, faucets and turrets, and includes the addition of a new acid waste system. Perimeter drainage piping will be added below the slab in two (2) lower- level areas to assist with the extraction of ground water drainage from the building via duplex storm water pump systems.

view live construction progress here