City of Dayton Touchless Plumbing Fixture Replacement

Project details

Project Type

Municipal

Client

City of Dayton

Contract Period

Oct 2020 – Dec 2020

Construction Manager

Architect

Engineer

Contract Value

$300,000

Scope

Plumbing Construction

project DESCRIPTION

The project consists of removing and replacing manual plumbing fixture components with electronic (or touchless) components to depress the spread of germs generally associated with ‘touch’ plumbing fixtures. The project required QCM to replace 427 manual water closet and urinal flush valves with sensor type flush valves and 314 manual lavatory faucets with sensor type faucets across all of the City of Dayton’s fifty two (52) owned properties.